What a BTO renovation package covers
Because a BTO starts bare, the work is about adding what the flat does not come with, not tearing things out. Our packages focus the budget where a new flat actually needs it.
- Carpentry: kitchen cabinets, wardrobes, vanity and feature carpentry built to the flat layout.
- Flooring: living, bedroom and service-yard flooring in tile, vinyl or laminate.
- Electrical and lighting: additional power points, downlights, cove lighting and data points by an EMA-licensed electrician.
- Finishing: painting, basic false ceiling and tiling top-ups where the flat needs them.
Packages by flat size
We scale the package to the layout so you are not paying for a 5-room scope in a 3-room flat.
- 2 and 3-room BTO renovation: compact packages focused on kitchen, wardrobes and lighting.
- 4-room BTO renovation: the most common scope, with full carpentry, flooring and electrical fit-out.
- 5-room BTO renovation: larger carpentry and flooring runs plus extra points for the bigger layout.
BTO renovation cost, fixed up front
The point of a package is that you know the price before work starts. Your BTO renovation cost is set by flat size, carpentry run length and finish level, all itemised in the quote. You can check typical rates in our published price guide, and there are no surprise variation orders mid-project.
Frequently asked questions
What does a BTO renovation package include?
Our BTO renovation packages cover carpentry (kitchen cabinets and wardrobes), flooring, lighting and EMA-licensed electrical points, plus painting and basic finishing. Everything is itemised so you can add or remove scope.
How much does a 4-room BTO renovation cost?
A 4-room BTO renovation commonly runs in the mid-to-high five figures depending on carpentry and finishes, since cabinetry and flooring are the main drivers. We quote line by line and fix the package price before starting.
Do you have packages for 3-room and 5-room BTOs?
Yes. We size packages from 2-room up to 5-room flats so the scope and price match your layout instead of a one-size quote.
How long does a BTO renovation take?
A BTO first fit-out typically takes 5 to 8 weeks, faster than a resale flat because there is little hacking. We give you a schedule before work begins.